Zhejiang, China
Business Type:
Manufacturer/Factory
Number of Employees:
23
Year of Establishment:
2013-04-03
Plant Area:
1200 square meters
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service
Sample Available

Lid Mould, Cover Mould, Mold manufacturer / supplier in China, offering Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould, Professional Production of High-End Pet Mineral Water Bottle Mould, Professional Production of High-End Pet Beverage Bottle Mould and so on.

Diamond Member Since 2019
Audited Supplier
Supplier Homepage Products Bottle Cap Mold Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
  • Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
  • Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
  • Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
  • Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
  • Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
  • Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould

Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould

Get Latest Price
Min. Order: 1 Piece
Port: Ningbo, China
Production Capacity: 100000PCS/Day
Payment Terms: L/C, T/T
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Multi Cavity
Plastic Material: PP/PE/PVC
Process Combination Type: Compound Die
Application: Household Appliances, Commodity, Home Use

You Might Also Like

Loading...

Basic Info

Model NO.
Bottle Cap Mould
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
CE, FDA
Standard
DME
Customized
Customized
Transport Package
Wooden Package
Specification
Cap Mould
Origin
Huangyan
HS Code
8480790090
Product name Cap Mould
Cavity number Customer' s requirement(ranges from 1 to 96 cavities)
Mold structure Hot runner or cold runner with vavle gate system(Germany HOTSET heaters)
Mold core/cavity material S136, NAK80 or as customer' s requirement
Product material PP
Delievery time 30-40days after get the deposit
Life Time3,000,000 shots or more ,can be customed
Package Wooden Case

 Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould

Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould






MOULD  MANUFACTURE  PROCESS
1) Cap Mould : grinding→fly-cutter →CNC Milling→drilling→lathe→boring lathe→electric pulse →fine fly-cutter→polish→electroplate→install
 
2) Preform Mould: grinding→drilling→lathe→boring lathe→fine fly-cutter→electroplate→install


Business Steps
1. R& D    We support customers' R& D. We'll make the  files or improve the design if you need
2. Quotation Making  Mould Quotation will be finished in 1 day according to information we get.
3. Negotiation    The negotiation includes quality, price, material, delivery time, payment item, ect.
4. Mould Design   We need to spend 3-5 days on mould and product 3D/2D drawing design
5. Mould   We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to get customers' approval first. Mould will be usually completed in 25-60 days
6. Mould Testing  When moulds are finished, we will test the moulds to check if they will satisfy consumers' needs. And we will send samples for consumers' reference.
7. Sample shoot   If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.
8. Delivery   We'll delivery goods either by sea or by air, according to customers' requirements.

Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould
Water Medical Oil Cosmetic Plastic PE Injection Bottle Cap Mould


FAQ
Q: what is your trade term?
A: normally FOBNINGBO, if customer country requires, also can accept L/C at sight.
Q: what is your payment term?
A: 30% down payment against order confirmation, 70% balance payment prior shipment.
Q: Have blow machine 100% assemnled well in stock?
A: NO.All blow machine will be assembly produced according to your order.
Q:what is your delivery time?
A: usually in 10-45days, depends on your projects.
Q: what about installing in customer factory?
A: after machine arrive your factory, please prepare water, electric,air and perform, then we will arrange engineer to install machine and train your workers, the longest time to free installing shall be in one week, you should afford engineer air tickets, food, hotel,transport.
Q: what is your packing?
A: wooden pallet packing.
Q:guarantee time?
A: one year guarantee, not man-made.


 
IF YOU WANT TO KNOW MORE INFO ,PLEASE CONTACT ME.

York Kwok
Taizhou Jingtu Plastic Mould Co.,Ltd
M:
008613216900876
A:West Industry Zone,Huangyan Taizhou ,Zhejiang,China

Send your message to this supplier

*From:
*To:
avatar Mr. York
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now